Taneytown, Md
Boothwyn, PA
The Hitch Man, Inc logo
Taneytown, MD
(484) 480-6346
Boothwyn, PA

Long-Lead Mini Fuse Bypass Switch

Sale!

Original price was: $72.95.Current price is: $54.95.

SKU: BKDK-58445 Category:

CURT 58445 Long-Lead Mini Fuse Bypass Switch for RV Dinghy Towing

  • 20-amp max
Additional Information

Additional information

Weight 0.45 kg
Dimensions 9.0000 × 4.0000 × 2.0000 cm
Description

This long-lead mini fuse bypass switch helps avoid having to remove and replace fuses when flat towing your vehicle. It is designed for vehicle-specific application and integrates with CURT RV harnesses for a custom-fit solution. It includes a bypass harness, fuse holder and other components.

Additional Attributes:

GTIN: 00612314584451
Class ID: 11
Container Volume Cubic Feet – XA: 0.00000
Container Volume Cubic Meter – XA: 0.00000
Finish – XA: BLACK RUBBER
Item Class – XA: CME
Item Height – XA: 0.000
Item Length – XA: 0.000
Item Width – XA: 0.000
Master Case Height Inches – XA: 0.000
Master Case Length Inches – XA: 0.000
Master Case Volume Cubic Feet – XA: 0.00000
Master Case Weight Lbs – XA: 0.000
Master Case Width Inches – XA: 0.000
Material – XA: THERMOPLASTIC RUBBER
Mount Type Description – XA: Not Applicable
Pallet Qty – XA: 0.000
Pallet Total Height Inches – XA: 0.000
Pallet Total Weight Per – XA: 0.000
Parcel Allowed – XA: Yes
Price Code – XA: E15
Product Weight – XA: 0.000
Prop 65 Label Text – XA: WARNING: This product can expose you to chemicals including Di(2-ethylhexyl) phthalate, which is known to the State of California to cause cancer, and Di-n-butyl phthalate, which is known to the State of California to cause birth defects or other reproductive harm. For more information go to www.P65Warnings.ca.gov
Prop 65 Material – XA: Di(2-ethylhexyl) phthalate/Di-n-butyl phthalate
Prop 65 Reason – XA: PVC Coated Wire
Prop 65 Warning Label Type – XA: Cancer and Birth Defect Causing
Prop 65 Warning Y/N – XA: YES
Rate Class – XA: 70.0
Retail Height – XA: 2.000
Retail Length – XA: 9.000
Retail Width – XA: 4.000
Sales Family Code – XA: ELECT
Sales Family Description – XA: ELECTRICAL COMPONENTS
Sales Group Description – XA: RV HARNESS
Shipping Weight – XA: 1.000
Side Application Type Description – XA: Not Applicable
Tariff 301 – XA: No
Truckload Volume Cubic Feet – XA: 0.00000
Warranty: One-Year Limited Warranty

Extended Information:

Emissions : Emissions Compliance Exempt
Life Cycle Status: Available To Order

Packaging:

Quantity of Each: 1.0
Package UOM: EA
Dimension: 9.0000 x 4.0000 x 2.0000 inches
Weight: 1.0000 PG

PDF: